Basking Ridge Kitchen E 2025
Oak Floor Restaining
Premium Color Solid Wood Cabinets
Ceiling Height Tile Backsplash
Electrical
Plumbing
New vent to exterior for hood
New appliance installation
Painting
Laundry room (not shown)
Bar and wine fridge (not shown)
Before
Basking Ridge Kitchen 2025D
Custom Color Solid Wood Cabinets (customer picked Benjamin Moore color)
Fit cabinets to curved wall
Tile backsplash for curved wall
Custom-made bifold spice cabinet door
Under-cabinet lighting
Electrical
Plumbing
New vent to exterior for hood
Painting
Before
Bedminster Kitchen I
Full kitchen renovation in Bedminster
Year
09/2023
Custom Vanity
Year
09/2023
Custom bathroom vanity in Bedminster
Hillsborough Kitchen
Client
Name here
Year
09/04/2023
-I moved the fridge into the pantry on the other side of the kitchen by enlarging the pantry and installing waterline and electricity.
-Then I built a half-wall between the kitchen and living room and built an island next to itl with additional storage underneath and to the side. I could have added a center island but that would limit the space to move around in the kitchen
-The counter is in quartz and the backsplash is in marble. I installed new flooring.
-We finally reconfigured the placements of the stove etc to allow optimal utilization and ventilation.
This is a completely remodelled kitchen in the Meadows community in Hillsborough. The original kitchen had very limited counter space. We completely reconfigured the space. This was a bigger project that took 15 days.
Ridge Kitchen I
Client
Name here
Year
09/04/2023
This was another kitchen I built in the Ridge townhouse community. The cabinets are solid wood in Shaker style in the Stone-colored stain. The counter and backsplash are both Quartz in Calacatta. The work finished in 4 days.
Day -45: Ordering cabinets (this color was not in stock so it took 6 weeks to arrive. In stock colors arrive in 10 days)
Day 0: Client cleans belongings out of kitchen. I assemble the RTA cabinets in my workshop
Day 1: Demolition
Day 2: Installing base cabinets. Taking measure for stone counter.
Day 3: Installing stone counter. Installing top cabinets. Done!